TTC Subway Closure

The TTC is shutting down 6 subway stations this weekend

Another weekend, another TTC subway closure to watch out for.

This time, there will be no subway service on Line 1 between Sheppard-Yonge and St. Clair stations on December 7 and 8 for Automatic Train Control signal system installation.

TTC Subway Closure

Map of the TTC subway closure happening on December 7 and 8. Photo by TTC.

Shuttle buses will operate between the stations during the closures. Regular scheduled subway service will resume on Monday morning.

The next scheduled closure will halt weekend service on Line 2 between Warden and Kennedy stations on December 15 for maintenance.

Lead photo by

MRDanMoFo


Latest Videos



Latest Videos


Join the conversation Load comments

Latest in City

Disturbing video shows Toronto car theft suspect slam into cop and send him flying

Toronto's new park with fake beach and lookout tower to open this summer

People are losing it over driver that lodged their truck under a bridge in downtown Toronto

Several species of lobster-like creatures spreading and causing havoc across Ontario

Ontario is the least satisfied with life out of every Canadian province and it's getting worse

All the ways Canadians will get more money from the government this summer

Toronto news headlines from 1881 are just as weird as today's

Long-closed Toronto park with hidden waterfall won't fully reopen until at least 2026